|
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED
<br /> Matthew J. Neal Senior Environmental Scientist a.TOTAL b.WITH CURRENT FIRM
<br /> 25 17
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC,Aiea,Hawaii
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Environmental Science/Geology,Willamette
<br /> University
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> • OSHA Initial HAZWOPER Training, 40-HR • Hazardous Waste Site Supervisor Training
<br /> • OSHA Refresher Training, 8-HR • Maritime Security Awareness Training(MARSEC)
<br /> • OSHA Construction Safety and Health Training, 30-HR • Bloodborne Pathogens, First Aid, CPR and AED
<br /> • Construction Safety Hazard Awareness Training for Training
<br /> Contractors, 40-HR
<br /> 18. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Dredged Material Evaluation for Dredging of the Ala PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Wai Canal,Honolulu,Oahu,Hawaii 2017
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Conducted a dredged material evaluation of sediments proposed for maintenance dredging from the Ala Wai
<br /> a. Canal. The project involved performing the following tasks: 1) preparation of a Work Plan/Sampling and
<br /> Analysis Plan that was submitted to and approved by U.S. EPA Region 9; 2) collection and analysis of sediment
<br /> samples from the canal for chemistry and bioassay testing for ocean disposal of sediments; and 3) preparation
<br /> of a Sampling and Analysis Report that was submitted to and approved by U.S. EPA Region 9. Fee: $443,257.
<br /> Role: Senior Environmental Scientist/Health and Safety Manager.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Site Investigation,Former Molokai Electric Company PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Power Generating Station,Kaunakakai,Molokai,Hawaii 2016-2018 -
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Conducted a Site Investigation (SI) of the former Molokai Electric Company (MOECO) site in downtown
<br /> Kaunakakai. The SI included a comprehensive study of residual near and subsurface contamination from
<br /> previous MOECO activities, primarily from chemicals of concern polychlorinated biphenyls (PCBs) and
<br /> b. petroleum and heavy metals. E2 collected over 700 discrete soil samples as well as 88 MULTI INCREMENT®
<br /> soil samples, soil-gas, concrete and groundwater samples. In addition, E2 conducted a synoptic water level
<br /> study to help determine potential migration of subsurface contaminants. Prior to completion of the field
<br /> portion of the project, E2 completed two Special Management Area (SMA) permit applications for the County of
<br /> Maui for the project. The results of the SI will be used to determine the most appropriate remedial action for
<br /> the site. Responsibilities included Project Management, completion of the SMA permits, field oversight and
<br /> coordination, drafting of the WP/SAP and a final report. Fee: $830,974. Role: Project Manager/Senior
<br /> Environmental Scientist/Health and Safety Manager.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Pearl Harbor Naval Shipyard Intermediate Maintenance PROFESSIONAL SERVICES
<br /> Facility Storm Drain Remedial Investigation,JBPHH, 2017
<br /> Oahu,Hawaii
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> E2 completed a Remedial Investigation (RI) to assess the nature and extent of contamination associated with
<br /> c. the storm drain lines identified in the previous Site Inspection (SI). The project required collection of data of
<br /> sufficient amount and quality to evaluation the nature and extent of contamination associated with each area of
<br /> concern at the site identified through the SI, and the degree of risk/hazard any releases may potentially pose to
<br /> human health and the environmental. The field work included soil, groundwater, and soil gas sampling and
<br /> analysis. A tier 1 human health risk assessment (HHRA), tier 1 ecological risk screening (limited to
<br /> contaminates of potential concern in groundwater), and tier 2 HHRA were also completed. Fee: $670,777.
<br /> Role: Project Manager, Senior Environmental Scientist.
<br /> COUNTY OF HAWAII-FY24- PAGE 4
<br />
|