|
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED
<br /> Arlene H.Campbell,L.G. Senior Geologist a.TOTAL a.TOTAL
<br /> 34 17
<br /> 14. FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC,Aiea,Hawaii
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> Graduate Work,Vanderbilt University Licensed Geologist,Washington - No. 1664
<br /> B.A., Geology, Minor Hydrology,Austin Peay University
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> • OSHA Initial HAZWOPER Training, 40-HR • Hazardous Waste Site Supervisor Training
<br /> • OSHA Refresher Training, 8-HR • Maritime Security Awareness Training(MARSEC)
<br /> • OSHA Construction Safety and Health Training, 30- • Bloodborne Pathogens, First Aid, CPR,and AED Training
<br /> HR
<br /> 18. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Phase I and II Environmental Site Assessments, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Environmental Hazard Evaluation,and Environmental 2015 -
<br /> Hazard Management Plan,Whitmore Village Property,
<br /> Wahiawa,Oahu, Hawaii
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> a. E2 completed a Phase II ESA as part of the due diligence process for a transfer of property ownership. Based
<br /> on E2's preliminary document review, historic research, interviews with current and former owner
<br /> employees, and limited site reconnaissance, contaminants of potential concern (COPC) were identified.
<br /> Conducted MULTI INCREMENT® and discrete sampling from shallow and subsurface soil and dry sediment.
<br /> Prepared an Environmental Hazard Evaluation/Environmental Hazard Management Plan (EHE/EHMP) to
<br /> address contamination remaining in place at the site. Fee: $90,000. Role: Project Manager/Senior Geologist.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Environmental Site Assessments,Kapalama Container PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Terminal Yard Project,Honolulu Harbor, Oahu,Hawaii 2015 Estimated 2024
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> Characterized the site to provide consistent and effective management practices and to mitigate potential
<br /> b. human health and environmental hazards associated with direct exposure to contaminants of potential
<br /> concern in soil, groundwater, concrete, sediment, and soil gas during proposed construction/dredging
<br /> activities required for the redevelopment of the site as a container terminal yard. Identified historic land use,
<br /> reviewed previous construction and environmental work, project design and planning, environmental
<br /> sampling, data management and evaluation, and report preparation. Fee: $500,000. Role: Senior Geologist.
<br /> *2023 ACECH ENGINEERING EXCELLENCE AWARD*
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Environmental Conditions of Property,Various Sites, Guam PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2022 -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> C. Gathered and analyzed data and information to classify the property into several ECP types. Reviewed
<br /> historical records, identified historic land use associated with hazardous materials and wastes, and reviewed
<br /> regulatory files, environmental reports, and permits, conducted a visual site inspection, oversaw data
<br /> management and evaluation, report prepared. Fee: $256,062. Role: Project Manager/Senior Geologist.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Preparation of Applications for WQC 401 and 404,Kalaeloa PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Barbers Point Harbor, Oahu,Hawaii 2012 -
<br /> d (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> Prepared the Section 401 WQC application that described the project, existing environment, and potential
<br /> environmental effects, chemical and biological, from proposed activities and included information regarding
<br /> the owner, general contractor, project site, and receiving state water. Fee: $23,822. Role: Project
<br /> Manager/Senior Geologist.
<br /> COUNTY OF HAWAII-FY24- PAGE 5
<br />
|