My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005739 06.30.23 STANTEC CAT PL.3, PL.4, PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.05 - Environmental- EA, EIS
>
PL-INT-2023-005739 06.30.23 STANTEC CAT PL.3, PL.4, PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2023 3:12:18 PM
Creation date
8/29/2023 9:29:13 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/30/2023
Permit Number
PL-INT-2023-005739
Description
STANTEC, PROFESSIONAL SERVICES FOR CAT PL.3, PL.4, PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawai'i <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE <br /> Hannah Hubanks Environmental Scientist a.TOTAL b.WITH CURRENT FIRM <br /> 12 1.5 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Stantec GS Inc. (Honolulu, HI) <br /> Stantec GS Inc.is owned and operated by Stantec Consulting Services Inc. through an internal affiliated operations plan. <br /> 16. EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND <br /> DISCIPLINE) <br /> MS, Natural Resources and Environmental Management <br /> BS, Zoology N/A <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Certifications and Training: NRCS Technical Service Provider (TSP) <br /> Continuing Education: 2022 National Military Fish and Wildlife Association-Natural Resources Annual Training Workshop <br /> (34 continuing education credits) <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) <br /> (2)YEAR COMPLETED <br /> City and County of Honolulu NPDES MS4 Monitoring (Honolulu, HI) <br /> PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> a Scope: Supported Municipal Separate Storm Sewer System (MS4) National Pollutant Discharge Elimination system <br /> (NPDES) permit required monitoring and reporting for the City and County of Honolulu, Storm Water Branch. The <br /> project continually implements storm water sampling procedures pursuant to the NPDES permit requirements and <br /> manages data for all associated industrial facilities. Duties include maintenance of remote water quality and <br /> atmospheric monitoring stations to collect first-flush storm water samples according to 40 CFR 136 and EPA <br /> guidelines. Provided support to telemetered monitoring stations involving data logging by automated sampling <br /> equipment and tracked/archived weather data. Size: N/A• Cost: $462K (2022) • Role: Environmental Scientist <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Environmental Monitoring Services for Geothermal Energy PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Conversion Plant, Puna Geothermal Venture (Pahoa, HI) Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> b. Scope: Provided oversight and management of environmental services for the geothermal power plant, Puna <br /> Geothermal Venture, located in Pahoa on Hawaii Island. Tasks included meteorological, air quality and groundwater <br /> monitoring services required by permit from the Hawaii Department of Health (HDOH). Responsibilities included <br /> management of environmental data collection and QA/QC processes for daily air quality reports, semi-annual <br /> hydrological monitoring reports, and monthly noise and meteorological and air quality monitoring reports as required by <br /> HDOH. Field activities included semi-annual groundwater sampling. Size: N/A •Cost: $2.4M • Role: Deputy Project <br /> Manager/Environmental Scientist <br /> STANDARD FORM 330 (REV. 7/2021) PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.