Laserfiche WebLink
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024-2025 <br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY NUMBER <br /> QUALIFICATIONS FOR THIS CONTRACT <br /> (Present as many projects as requested by the agency, or 10 projects, if not specified. 0 <br /> Complete one Section F for each project.) <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED <br /> PROFESSIONAL CONSTRUCTION <br /> Inventory of the Oahu Railway and Land Company Right-of-Way SERVICES (If applicable) <br /> (Honolulu, HI) 2024 N/A <br /> 23.PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> State of Hawaii, Department of Transportation Robert Sun (808)692-7578 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY(Include scope,size,and cost) <br /> Duration: <br /> • <br /> +• ` L May 2023 Started-May 2024 Ended <br /> • Size and Cost: „ <br /> `. Size: 17 linear miles <br /> AECOM Fee:$177,460 <br /> ark <br /> 48 � Key11 Personnel: <br /> �, I 9 Jamie Hikiji(Project Manager) <br /> Adriane Truluck(Deputy Project Manager, Historic Landscape <br /> Architect) <br /> Brian Albright(Technical Lead,Senior Historian) <br /> Kate McCormick(GIS Analyst) <br /> ORL, West of Honolulu, 1891 Erika Espaniola(Cultural Resource Subject Matter Expert and <br /> Archaeologist) <br /> Integrity assessment for a 17-mile linear resource that is the Haley Cremer(Survey Support; GIS) <br /> longest historic narrow-gauge railway segment in the United -Melia Warning(Survey Support) <br /> States. <br /> on the GIS-based field application Fulcrum,which allowed real time <br /> Project Overview cataloging of extant features to be recorded in detail and geographic <br /> As"the longest stretch of continuous railroad track in Hawaii";the accuracy.This data was used to develop report figures,support historic <br /> Oahu Railway and Land Company(ORL)is a significant historic determinations,and fulfill raw data GIS deliverables. <br /> property listed on the Hawaii Register of Historic Places and the Describe major design/project challenges: <br /> National Register of Historic Places.AECOM prepared an inventory The geographic survey area,which stretched 17 miles across the <br /> of the existing features and characteristics of the ORL for the Hawaii Southwestern portion of the island of Oahu included a variety of <br /> Department of Transportation(HDOT). environmental and site-specific hazards(high heat, remote areas, <br /> variable working conditions).AECOM's commitment to site safety and <br /> Scope of Work safe work plan was implemented and utilized daily at pre and post <br /> AECOM provided a comprehensive inventory of the ORL for HDOT, tailgate meetings,prioritizing team safety and ensuring field work was <br /> including a historical and social context desktop analysis,a historically completed on-time. <br /> informed field survey which included GIS documentation of the 17-mile <br /> survey area,and a final comprehensive report with associated GIS data Performance <br /> deliverables. The four-person field team performed the 17-mile survey within the <br /> outlined field schedule and with enough time to review,ensuring that <br /> Technical Highlights and Challenges data was accurately documented.The team worked through the large <br /> Assessing historic and existing site conditions across an expansive data sets to parse and refine applicable data and complete the draft <br /> linear survey area which has undergone decades of varied development report to meet the SOW deliverables on time. <br /> proved to be a substantial undertaking.AECOMs diverse team,which <br /> included a Secretary of Interior-qualified archaeologist,an industrial <br /> archaeologist,a historical landscape architect,a GIS analyst,and <br /> environmental planners assessed historical documents and deeds, <br /> archival imagery,data,and maps,to produce a list of over 150 potential <br /> features.The field team deployed with prepared interactive field maps <br /> 25.FIRMS INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. AECOM Technical Services, Inc. Honolulu, HI Prime Consultant <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I - PAGE 19 <br />