Laserfiche WebLink
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Vijaya Tummala,P.E. Sr.Civil/Environmental Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 22 15 <br /> is.FIRM NAME AND LOCATION(City and State) <br /> EnviroServices&Training Center,LLC(ETC),Honolulu,Hawai`i <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> B.S.,2000,Osmania University,India,Civil Engineering • Hawai`i,Registered Professional Engineer(PE 15516) <br /> M.S.,2003,West Virginia University,Civil Engineering • Texas,Registered Professional Engineer(150075) <br /> • Hawai`i,Certified Inspector of Sediment and Erosion Control(CISEC) <br /> • Hawai`i,EnviroCert Certified Professional in Erosion and Sediment Control(CPESC) <br /> • Certified Floodplain Manager(CFM) <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> • Texas Floodplain Management Association,Member <br /> • Presenter at Hawaii Department of Transportation 2023 Protect Our Water Conference <br /> • Instructor at a day-long February 2016 seminar"Construction and Post-Construction BMPs"in Honolulu <br /> 19.RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> State of Hawaii,Department of Transportation,Highways Maui District, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Storm Water Management Program,Island of Maui(Kahului,Hawaii) On-going <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> a• Serving as the Subject Matter Expert overseeing Highways Maui District's Storm Water Management Program(SWMP),providing National Pollutant <br /> Discharge Elimination System(NPDES)Municipal Separate Storm Sewer System(MS4)Permit compliance,civil and environmental engineering services <br /> for erosion control,storm drain retrofit initiatives and post-construction Best Management Practices(BMPs)projects,with a focus on Low Impact <br /> Development(LID)techniques.Responsibilities include managing engineering design projects such as the Stable Road Post-Construction BMP and the <br /> replacement of aboveground storage tanks at Kahului Baseyard.Additionally,developed Standard Operating Procedures to facilitate the thorough review of <br /> projects and ensure effective implementation of post-construction BMPs.Project Engineer.$25,000,000. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Environmental Engineering Management at Daniel K.Inouye International PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Airport and Kahului Airport(Honolulu and Kahului,Hawaii) 2022 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> b. Responsible for providing technical support to the Department of Transportation,Airports Division(DOTA)NPDES M54 Permit compliance requirements <br /> at Daniel K.Inouye International Airport and Kahului Airport.These requirements include developing and implementing control measure procedures that <br /> address the required public education and outreach,illicit discharge detection and elimination,construction site runoff control,post construction BMPs, <br /> pollution prevention and good housekeeping,and tenant activities discharge management.Also,responsible to ensure that DOTA complies with other <br /> environmental requirements that pertain to:underground storage tanks;aboveground storage tanks;Spill Prevention Control and Countermeasure(SPCC); <br /> sampling and monitoring;water quality,maintenance baseyards;reporting;asset management systems(AMS);GIS mapping;and permit negotiations. <br /> Project Engineer.$9,000,000. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> State of Hawaii Department of Transportation's Storm Water Management PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Program Plan(Statewide,Hawaii) 2016 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> ETC served as the State of Hawaii's Master Consultant and provided compliance with stormwater management requirements established in the agreement <br /> C• (Consent Decree)between the State of Hawaii Department of Transportation Highways Division,the Environmental Protection Agency,Hawaii <br /> Department of Health,and the DOT's NPDES MS4 permit.As Master Consultant,ETC ensured that all stormwater management requirements were <br /> met.Involved in maintaining an Asset Management System(AMS),implementing and inspecting debris control BMPs,designing erosion control BMPs, <br /> ensuring construction site runoff control,developing post-construction stormwater management in new and redevelopment,inspecting illicit connections/ <br /> illegal discharges,overseeing industrial/commercial activities discharge management,assisting with maintenance facilities BMPs,conducting stormwater <br /> monitoring,meeting waste load allocation goals,coordinating public outreach,conducting training,and preparing and submitting compliance reports. <br /> Project Civil Engineer.$39,500,000. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Storm Water Management Program,Hawaii Army National Guard(HIARNG) PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Facilities(Honolulu,Hawaii) 2015 <br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE n Check if project performed with current firm <br /> Responsible for developing a SWMP for HIARNG's M54 NPDES permit,HI S00052.Reviewed the relevant environmental documents provided by <br /> HIARNG,coordinated with HIARNG to develop procedures and policies to comply with HIARNG's M54 NPDES Permit and recommended BMPs.Drafted <br /> comprehensive updates of HIARNG's SWMP supporting the following minimum control measures:public education and outreach;public involvement and <br /> participation;construction site runoff control;post-construction stormwater management;and pollution prevention/good housekeeping.Project Engineer. <br /> STANDARD FORM 330(REV.7/2021) <br />