My WebLink
|
Help
|
About
|
Sign Out
Home
2025-06-23 PL-INT-2025-010806 EnviroServices & Training Center, LLC - Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 25-26
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2025-06-23 PL-INT-2025-010806 EnviroServices & Training Center, LLC - Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2025 12:26:01 PM
Creation date
6/23/2025 12:23:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20.EXAMPLE PROJECT KEY NUMBER <br /> (Present as many projects as requested by the agency,or 10 projects,if not specified.Complete one Section F for each project.) 5 <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED <br /> Off-Site Contamination Unit,Site Investigation,and Remedial Action PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> at Kapalama Incinerator Site(Honolulu,Hawaii) On-going <br /> 23.PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> City&County of Honolulu Department of Environmental Services Julie Ann Leano (808)768-3424 <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> EnviroServices&Training Center(ETC)was retained by the City&County of Honolulu, <br /> Department of Environmental Services(ENV)as the prime consultant to provide environmental <br /> consulting services associated with further remediation and investigation of residual <br /> contaminants associated with historical incinerator operations. <br /> Project tasks included the preparation of a Summary Analysis Report to gather site-related ti_- <br /> information into a single document and a Corrective Action Work Plan to detail activities to be __ _ <br /> performed to address residual contaminants located within the former incinerator site boundaries. - r <br /> Corrective Action was implemented through collection of multi-incremental soil samples to <br /> further characterize areas of suspect contaminant impact(remedial investigation phase), <br /> excavation/segregation/hauling/disposal of contaminated soils and incinerator ash,and collection <br /> of confirmation soil samples to evaluate the effectiveness of the removal action.A Corrective rv° <br /> Action Report was prepared to document findings of the initial remedial investigation phase,_ <br /> removal/transportation/disposal of nearly 500 tons of residual contaminated soil and ash,results " <br /> sA. is <br /> of the air monitoring activities implemented during the removal action,results of the confirmation <br /> soil samples,and the remaining environmental hazards at the site associated with the residual <br /> contaminant concentrations. .. . <br /> ETC was also tasked with modeling ash dispersion from the former incinerator stack using a <br /> commercial version of the USEPA AERMOD dispersion model to predict potential areas of concern <br /> pertaining to impacts from ash outfall.An Off-Site Investigation Work Plan presented the planned <br /> approach objectives,and methodology for the initial phase of the off-site investigation to address <br /> perceived gaps in the existing data associated with the extent of potential impacts from former <br /> incinerator operations.Implementation of the Off-Site Investigation Work Plan included collection Relevant Services <br /> of multi-incremental surface soil samples,discrete subsurface soil samples,and discrete sediment <br /> samples from the Kapalama Drainage Canal.Findings from the investigation were documented in <br /> a Site Investigation Report and Environmental Hazard Evaluation.Thereafter,an Environmental Phase III Remedial <br /> Hazard Management Plan was prepared to document and address the existing environmental Investigation <br /> hazards.Furthermore,an interim engineering control consisting of geotextile fabric cover was <br /> installed over exposed surface soils containing elevated lead concentrations within the Kokea <br /> Street parking lot.This interim control is currently being monitored and maintained on a monthly dArnI Environmental Hazard <br /> basis until the start of planned site development. Evaluation(EHE) <br /> Contract Amount:$640,000 <br /> Environmental Hazard <br /> Management Plan <br /> 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. EnviroServices&Training Center,LLC Honolulu,Hawaii Prime Consultant <br /> STANDARD FORM 330(REV.712021) <br />
The URL can be used to link to this page
Your browser does not support the video tag.