F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20.EXAMPLE PROJECT KEY NUMBER
<br /> (Present as many projects as requested by the agency,or 10 projects,if not specified.Complete one Section F for each project.) 6
<br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED
<br /> Voluntary Response Program-Environmental Site Investigation PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> of Former Waialua Sugar Mill(Waialua,Hawaii) 2019
<br /> 23.PROJECT OWNER'S INFORMATION
<br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER
<br /> Castle&Cooke Waialua,LLC Chris Lovvorn (808)548-3714
<br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
<br /> Based on historical operations at the Waialua Sugar Mill facility,the suspect contaminant sources
<br /> generally included former underground and aboveground fuel storage tank systems,pesticide
<br /> mixing and loading activities,vehicle maintenance activities,electrical transformer storage,former I 40110111-,
<br /> sugarcane processing operations,and a commercial vehicle towing baseyard. `� !
<br /> Under the VRP,ETC investigated the extent of soil and groundwater contamination for metals
<br /> (arsenic,cadmium,lead,mercury,thallium,vanadium,zinc);herbicides/pesticides;dioxins/
<br /> furans;polychlorinated biphenyls(PCBs);total petroleum hydrocarbons as diesel/gas/oil(TPH-D,
<br /> TPH-G,TPH-0);methyl tertiary-butyl ether/benzene/toluene/ethylbenzene/xylenes(MBTEX);
<br /> dimethyl phthalate;polynuclear aromatic hydrocarbons(PAHs);and halogenated volatile organic
<br /> compounds(HVOCs).In order to assess the potential impacts,the site was divided into 27 surface
<br /> and/or subsurface decision units.Discrete and multi-increment soil samples were collected
<br /> from these 27 decision units.Monitoring wells were also installed and sampled using low-flow _,....
<br /> methodology to assess potential impacts to the underlying groundwater.Approximately 80
<br /> discrete soil samples,multi-increment soil samples,and groundwater samples were collected - „ A
<br /> and analyzed.In addition,ETC also conducted personal,perimeter,and work area air monitoring,
<br /> .46
<br /> during all aspects of the project to protect the workers and surrounding public.
<br /> Deliverables for the project included a Phase I ESA,conceptual site model,and general and ,.
<br /> detailed site investigation plan.Specifically,a Site Investigation Report and Environmental Hazard ,.. *!
<br /> Evaluation(SI-EHE)was prepared to document site investigation activities,compare data to
<br /> applicable DOH EALs,and evaluate/discuss all potential environmental hazards associated with
<br /> the site.A Remedial Alternatives Analysis(RAA)evaluated four potential remedial alternatives,
<br /> which were then compared to nine evaluation criteria.Upon completion of the RAA,a Draft
<br /> Remedial Action Memorandum(Draft RAM)was created to summarize findings and activities
<br /> performed to date.A Public Participation Plan was also developed to solicit input from members
<br /> of the affected public regarding the planned work to be completed on portions of the site to
<br /> mitigate environmental hazards.A Public Meeting was then held and comments obtained
<br /> through the public participation program were used to create a Final RAM and develop a
<br /> Remedial Action Work Plan. Relevant Services
<br /> Prior to implementation of the selected remedial action,an interim Environmental Hazard
<br /> Management Plan(EHMP)was prepared for use by the site contractor.Construction activities for Environmental Site
<br /> the implementation of the selected remedial action were monitored to ensure adequate controls Assessment(ESA)
<br /> were maintained to minimize or eliminate airborne contaminant hazards.Following completion of
<br /> construction,a Remedial Action Report was completed to document the implementation of the d
<br /> final remedy and a final EHMP for managing the remaining environmental hazards on-site was el CO Environmental Hazard
<br /> prepared.In December 2018,the DOH issued a Letter of Completion,subject to the terms and - , Evaluation
<br /> conditions of an Environmental Covenant Agreement,the final EHMP,and the completion of a
<br /> Groundwater Monitoring Program. ^©- Remedial Action
<br /> "• &Design
<br /> Contract Amount:$750,000
<br /> 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
<br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
<br /> a. EnviroServices&Training Center,LLC Honolulu,Hawai'J Prime Consultant
<br /> STANDARD FORM 330(REV.7/2021)