|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Barry Toyota Sr. Quality Control Specialist—Civil a.TOTAL b.WITH CURRENT FIRM
<br /> Engineering 53 44
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Wilson Okamoto Corporation, Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Civil Engineering, University of Hawaii at Manoa, 1980 PE-5502, Hawaii, Civil Engineering, 1983
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Mr. Toyota has substantial management and design experience for a broad range of engineering projects in Hawaii. Mr.Toyota's
<br /> experience includes airports;facility plans; preliminary engineering reports; infrastructure system designs;world-class resorts such as
<br /> the Grand Wailea and the Four Seasons Wailea; condominiums; agricultural, industrial, and residential subdivisions; golf courses;
<br /> shopping centers; schools; hospitals;warehouses; and, sewer, roadway and flood control improvements. He has also worked on
<br /> various military projects. With such experience he provides quality control by reviewing plans and reports for adherence to established
<br /> standards, completeness and accuracy of work throughout the course of a project.
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Honolulu Rail Transit Guideway and Transit Stations, Phase 3
<br /> Airport Section (Design-Build), Honolulu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Active Under Construction
<br /> a. (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> As Sr. Quality Control Specialist, Barry reviews civil construction plans for guideway and transit stations. Phase 3 consists of the
<br /> construction of 5.2 mile long grade separated fixed guideway rail transit system, including four transit stations, beginning from Aloha
<br /> Stadium to Middle Street. Scope of work includes civil design of widening of the roadways to accommodate the new elevated
<br /> guideway and support columns and site plans for transit stations.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kapolei Interchange Phase 2 PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Kapolei, HI 2021 2020
<br /> b (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> As Sr. Quality Control Specialist, Barry reviewed construction plans for Kapolei Interchange Improvements, Phase 2. The Project
<br /> is located on Interstate Route H-1, between the existing Makakilo Interchange and existing Palailai Interchange. The Kapolei
<br /> Interchange will provide an off ramp for West bound traffic on H-1 to access Wakea Street via a system of at grade ramps,
<br /> elevated bridge/overpass roadway, and connections to Farrington Highway. Also included are connections to the improvements
<br /> currently under construction for the Interstate Route H-1.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> P-209 Dry Dock No. 3(future No.5) (NAVFAC Pacific)JBPHH, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Active Under Construction
<br /> C. (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> As Sr. Quality Control Specialist, Barry reviews construction plans for the project related to landside site features and below
<br /> grade wet utilities (water, drainage, and gravity sanitary sewer). Also establishing project design storms for site and dry dock
<br /> storm drainage system design.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> FY 22 MCON P-309 GCE Infantry Battalions 1 &2 Facilities
<br /> Naval Support Activity, Marine Corps Base, Guam PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Design—11/2023 Under Construction
<br /> Construction Admin-
<br /> Active
<br /> d. (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> NAVFAC Pacific is proposing a new GCE Infantry Battalions 1 & 2 Facilities Naval Support Activity (NSA), Marine Corps Base,
<br /> Guam. As Sr. Quality Control Specialist, Barry is reviewing construction plans for site improvements, including, roadways and fire
<br /> lanes; site walkways; parking; enclosures for site equipment such as emergency generator fuel tank, transformer pads, concrete
<br /> storage pad, perimeter security fencing and gates (for pedestrian &vehicle), drainage system, sanitary sewer system and potable
<br /> water system. ECC: $126 million
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 16
<br />
|