Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT <br /> QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER <br /> (Present as many projects as requested by the agency, or 10 projects,if not specified. <br /> Complete one Section F for each project.) 8 <br /> 21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED <br /> Malaekahana State Recreation Area (SRA) — Kahuku PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Section, Park Improvements 2022 On-going <br /> La`ie, Hawaii <br /> 23.PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c.POINT OF CONTACT <br /> State of Hawaii Ms.Valerie Suzuki, P.E. TELEPHONE NUMBER <br /> Department of Land and Natural Resources (808) 587-0275 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> x • S"k• Planning and Design Fee-$1,394,000 <br /> '> Construction Cost-$9,300,000 <br /> •w! I Iwo 1.1 1r' i+ <br /> ua. oIIIIIIlIII .Scope <br /> Civil planning and design services to upgrade the camping <br /> experience at Malaekahana SRA, Kahuku Section. <br /> Relevant Protect Elements <br /> Ai Master Planning Ai Permit Applications <br /> Ai Environmental Assessment Ai Construction Documents <br /> New Cabin No.2 Ai Agency Coordination Ai Public Meetings and Outreach <br /> TLCG was responsible for preparing site development planning environmental clearances and permits including a shoreline <br /> report; environmental assessment; demolition plans of existing certification and Special Management Area permit. An <br /> cabins and auxiliary facilities; and design of new cabins, comfort Archaeological Inventory Survey was prepared to comply with <br /> station, satellite restrooms, pot washing stations, campgrounds, State Historic Preservation Division (SHPD) requirements <br /> parking lots, and utilities at the Malaekahana SRA, Kahuku because the cabins were potentially historically significant. <br /> Section. Cultural impact assessments and biological surveys were <br /> completed for the Environmental Assessment(EA)in accordance <br /> The project was originally intended to replace illegal cesspools; with HRS Chapter 343. The Final EA was published in 2016. <br /> however, the scope of work quickly broadened to address new <br /> problems identified during initial site investigations. The project In addition to designing the recommended facility improvements, <br /> focus shifted to a comprehensive condition assessment of all TLCG designed new civil and electrical infrastructure to support <br /> property facilities, including the seven cabins that were observed the re-designed property. Infrastructure included wastewater <br /> to be uninhabitable due to structural integrity and presence of collection and treatment, water, drainage, grading, roadways, <br /> hazardous materials. walking paths, ADA-accessible parking stalls, communication, <br /> and power. <br /> During the planning phase of the project, TLCG prepared cabin <br /> replacement recommendations along with a list of necessary Project Status:Construction expected to be completed in 2025. <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. EnviroServices&Training Center, LLC Honolulu, Hawai'i Environmental Planning, Hazardous <br /> Materials Management <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> b. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> C. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> d. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> e. <br /> STANDARD FORM 330(REV.8/2016)PAGE 3 <br />