Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT <br /> QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER <br /> (Present as many projects as requested by the agency, or 10 projects,if not specified. <br /> Complete one Section F for each project.) 9 <br /> 21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED <br /> Maui Office Annex Building PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Wailuku, Maui 2016 2019 <br /> 23.PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c.POINT OF CONTACT <br /> State of Hawaii Mr. Brandon Kim, P.E. TELEPHONE NUMBER <br /> Department of Land and Natural Resources (808) 587-0248 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> Planning and Design Fee-$905,000 <br /> Construction Cost-$7,850,000 <br /> �� Scope <br /> log <br /> • .11 PI OM MGM I Civil planning services to evaluate the existing structure and <br /> infrastructure conditions of an aging administration building and <br /> design services for site improvements and the construction of a new <br /> office building. <br /> Relevant Protect Elements <br /> New DLNR Administration Building V Feasibility Study and Analysis V Environmental Assessment <br /> Ai Construction Documents V Permit Applications <br /> Planning Design <br /> TLCG prepared a Concept Plan Report to evaluate the existing TLCG's recommended alternative was to demolish the existing <br /> structure of the building and parking requirements; assess building and construct a new building with improved on-site <br /> infrastructure capacities, constraints, and deficiencies; identify infrastructure. Design included the construction of a single-story, <br /> easements, permit requirements, and building code and non- slab-on-grade structure; retaining wall; new curbs and asphalt <br /> conformance violations; provide site and space planning concrete paving and pavement; security fencing and entry gates; <br /> recommendations; and evaluate the feasibility of and areas for solid waste receptacle, bicycle storage,and covered <br /> repair/rehabilitation vs. total replacement. boat storage. New utilities included installation and connection of <br /> a new water meter; construction of new fire hydrant; extension of <br /> Environmental Assessment sewer main and construction of new lateral sewer connection; <br /> The project scope also included the preparation of all necessary water, sewer, and electrical service to the building; and closure of <br /> environmental clearances, including incidental and related onsite cesspool per DOH requirements. <br /> technical work associated with the preparation, assimilation, and <br /> publication of the Draft and Final Environmental Assessments <br /> (EA) in accordance with HRS Chapter 343. The Final EA was Project Highlight <br /> published in 2014. The Planning Report integrated the needs of multiple DLNR <br /> division offices into a design that satisfies individual functionality, <br /> space, and personnel requirements. <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> b. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> C. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> d. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> e. <br /> STANDARD FORM 330(REV.8/2016)PAGE 3 <br />