Laserfiche WebLink
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE <br /> Pamela K. Uyeda, PE, LEED AP BD+C, CISEC Project Manager or Civil Task Leader a.TOTAL b.WITH CURRENT <br /> FIRM <br /> 29 29 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> WSP USA Inc., Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> M.S., Civil Engineering Hawaii, Professional Engineer <br /> B.S., Civil Engineering Hawaii, LEED AP BD+C <br /> Hawaii, Certified Inspector Sediment and Erosion Control <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Lydgate Park-Kapaa Bike/Pedestrian Path, Phases C &D, Kauai, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> On-going On-going <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> a. Project manager responsible for overseeing the preliminary right-of way acquisition, permitting, and development of conceptual design <br /> plans for a new coastal shared use path through resort properties near Kapaa. Project scope also includes preparation of easement <br /> maps, land appraisals for each affected property(11 total), assisting in a deed transfer document, and processing the first SMA/SSV <br /> applications under the County new shoreline ordinance. <br /> Contract Fee: $1.3 million <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Total Maximum Daily Loads (TMDL) Monitoring and Best Management PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Practices (BMP)Activities Tracking, Oahu, Hawaii On-going <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project manager responsible for assisting the City and County of Honolulu, Department of Environmental Services (ENV) in meeting <br /> b regulatory requirements of its Municipal Separate Storm Sewer System (MS4) permit. Duties include reviewing Environmental <br /> Protection Agency/Department of Health (EPA/DOH) permit language revisions, developing end-of-pipe and stream monitoring plans, <br /> developing a work plan for establishing local event mean concentration loads for urban land uses, developing implementation and <br /> monitoring plans for TMDL watersheds, and tracking and calculating load reductions for the City's BMP activities. Supplementary tasks <br /> include assisting ENV with watershed water quality modeling efforts, preparation of a Green Infrastructure Handbook,tracking TMDL <br /> development nationwide, and preparation of the Annual Monitoring Plan and Annual Monitoring Report for submittal to DOH. <br /> Contract Fee: $3.2 million. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Improvements to Maluhia Road (Rte 520)and Koloa Road (Rte 530), PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Kauai. Hawaii On-going On-going <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> `' Project manager responsible for assessing nearly seven miles of roadway pavement for resurfacing/rehabilitation repair options. <br /> Project involved the development of PS&E, including adding paved shoulders throughout the project limits, a new roundabout, lane <br /> modifications at several key intersections, replacement of destination signs, and other ancillary improvements. <br /> Contract Value: $896 thousand <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Fort Weaver Road Widening, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2010 2010 <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Deputy project manager responsible for overseeing the preparation of PS&E package for the widening of approximately 2.5 miles of <br /> d. Fort Weaver Road from 4-lanes to 6-lanes. Job duties included roadway/alignment design;traffic signal design; hydrologic/hydraulic <br /> study and drainage report; bridge scour report drainage system modeling and design; traffic control plans; signing and pavement <br /> marking design; NPDES Permit; Basis of Design & Design Exception Report; and coordination with the State Department of <br /> Transportation, the Contractor, City agencies, and private landowners. <br /> Estimated Construction Value: $58 million <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 5 <br />