My WebLink
|
Help
|
About
|
Sign Out
Home
2011-01-ES Executive Summary - Limited Scope Performance Audit Parks and Recreation Facilities Asset Management
PublicDocuments
>
Legislative Auditor
>
Audit Reports
>
County Auditor Reports
>
2011-01-ES Executive Summary - Limited Scope Performance Audit Parks and Recreation Facilities Asset Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2011 9:54:40 AM
Creation date
7/22/2011 9:54:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Strategic Plan Outdated and Has Not Been Fully Implemented <br />Recommendation 2.2: <br /> P&R should complete updating its 2004-2009 Strategic Plan. An <br />ongoing process for updating its strategic plan, and reviewing a <br />achieving strategic goals should also be developed. <br />No Written Hazardous Materials Mediation Plan <br />Recommendation 2.3: <br />P&R should develop a plan to remediate hazardous materials issue <br />its facilities, and integrate it into an overall asset managemen <br />report on performance. The hazardous materials remediation plan <br />measures implemented at each facility as well as cost estimates to remediate each identified <br />hazardous condition. <br />ADA Access Plan Not Integrated into Asset Management Plan <br />Recommendation 2.4: <br />P&R should integrate its ADA Access Plan into an overall asset <br />management plan with a process to track and report on performanc <br />Insufficient Periodic Maintenance Plan <br />Recommendation 2.5: <br />The Parks Maintenance Division should develop a comprehensive <br />periodic maintenance plan that includes schedules for critical m <br />components, such as roof painting and termite treatment. <br /> <br />Lack of Plan to Reduce Maintenance and Repair Backlog <br />Recommendation 2.6: <br />P&R should develop a plan to reduce its backlog of deferred <br />maintenance and repairs based on a current facilities condition <br />an overall asset management plan with a process to track and report on performance. <br /> <br />Insufficient Prioritization of Projects <br />Recommendation 2.7: <br />P&R should develop a method for prioritizing its facilities main <br />projects that is based on asset management best practices. This <br />priority on preventative maintenance and timely completion of mi <br />are required. <br /> <br />FINDING THREE:P&R’s BUDGETING PROCESS FOR FACILITIES MAINTENANCE AND <br /> <br />REPAIRS IS INSUFFICIENT <br />Budget Process Does Not Incorporate Facilities Data <br />Recommendation 3.1 <br />: P&R needs to develop and implement a budget process that <br />incorporates facilities condition information reported by its Pa <br />Divisions in order to sufficiently plan, prioritize, and budget <br />corrective measures. Once budgeted, Operating funds should be e <br />prioritized periodic maintenance and repair activities to preven <br />the need for major repairs requiring CIP funds. <br /> <br />Budget Process is Insufficient and Lacks Transparency <br />Recommendation 3.2: <br />P&R needs to develop and implement a budget process that <br />incorporates assessing the condition of all of its facilities; p <br />needs; planning its maintenance and repair activities and schedu <br />performance, and outcomes in order to adequately budget for its <br />operations and projects. <br />3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.