My WebLink
|
Help
|
About
|
Sign Out
Home
General Requirements and Covenants (2)
PublicDocuments
>
Public Works
>
Administration Division
>
99_Archive
>
02_Bid Information
>
Documents
>
General Requirements and Covenants (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2018 1:51:15 PM
Creation date
12/11/2017 12:59:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />(c) <br />Additional ado I -. Mew and unforseen work will be classed as additional <br />work when determined by the Engineer that such work is not covered by <br />any of the various items for which there is a bid price or by combina- <br />tions of such items. In the event portions of such work are deter- <br />mined by the Engineer to be covered by same of the various items for <br />which there is a bid price or combinations of such items, the remaining <br />portion of such work will be classed as additional work. Additional <br />work also includes work specifically designated as additional or <br />extra work in the plans or specifications. <br />The Contractor shall do such additional work and furnish material <br />and equipment therefor upon receipt of an approved change order or <br />other approved written order of the Engineer; and in the absence of <br />such approved change order or other approved written order of the <br />Engineer, he shall not be entitled to payment for such additional <br />work. Where such additional work is ordered by a written order other <br />than a change order, the Engineer will as soon as practicable issue a <br />change order therefor. <br />Compensation for this change order shall be determined as follows: <br />1. The Contractor shall carefully examine the additional work <br />requested and submit detailed cost breakdowns within ten <br />(10) working days.for material, equipment and labor for the <br />Engineers approval. An applicable percentage for insurance <br />and fringe benefits will be allowed for labor. To the total <br />cost estimate, a 15% overhead and profit will be allowed to <br />the firms doing the actual work. In addition, a 10% overhead <br />and profit will be allowed the General Contractor only on the <br />cost estimate of a subcontractor. The applicable State tax will <br />be allowed. <br />2. Should the Engineer find that the Contractor's cost estimate <br />is unreasonably high or incorrect, he will so notify the <br />Contractor to re-examine the additional work and resubmit <br />revised detailed cost breakdowns within ten (10) consecutive <br />working days. <br />3. Should the Engineer find that the Contractor's revised <br />detailed cost breakdowns are still unreasonably high or <br />incorrect, he will issue a change order based on his cost <br />estimate. Should the Contractor disagree with any terms or <br />conditions set forth ina change order which he has not executed, <br />he shall submit a written protest to the Engineer within 5 days <br />after the receipt of such change order. The protest shall state <br />the points of disagreement, contract specification references <br />and, if possible, the quantities and costs involved. If a <br />written protest is not submitted within said five (5) days <br />period, the change order shall be deemed unprotested, and payment <br />will be made as set forth in the change order and such payment <br />shall constitute full compensation for all work included therein <br />or required thereby. Such unprotested change orders mill be <br />considered as executed change orders. <br />Section 4 <br />Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.