My WebLink
|
Help
|
About
|
Sign Out
Home
General Requirements and Covenants (2)
PublicDocuments
>
Public Works
>
Administration Division
>
99_Archive
>
02_Bid Information
>
Documents
>
General Requirements and Covenants (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2018 1:51:15 PM
Creation date
12/11/2017 12:59:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />L.5 FINAL CLEANING UP — Before final inspection of the work, the Contractor <br />shall clean all ground occupied by the Contractor in connection with the work <br />of all rubbish, excess materials, temporary structures and equipment, and all <br />parts of the work left in a neat and presentable condition to the satisfaction <br />of the Engineer. However, the Contractor shall not remove any warning and <br />directional signs prior to the formal acceptance by the Engineer. Full <br />compensation for final cleaning up will be considered as included in the prices <br />paid for the various items of work or lump sum bid, as the case may be, and <br />no separate payment will be made therefor. <br />Section 4 <br />Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.