My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0449.000 1996-1998
ClerkCouncil
>
Council Records
>
Communications
>
1996-1998
>
COM 0449.000 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 1:39:28 PM
Creation date
5/10/2008 7:55:10 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
1996-1998
Communication
0449
Point
000
Author
Donna Fay Kiyosaki, Chief Engineer
Communications - Referred To
FC
Communications - File Code
SEW
Document Relationships
AGE COUNCIL 09/17/1997 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Council
AGE FC 09/02/1997 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Finance Committee (FC)
REP FC 131 09/02/1997 1996-1998
(Related To)
Path:
\Council Records\Reports\1996-1998\Finance Committee (FC)
REP FC 131 09/02/1997 1996-1998
(Related)
Path:
\Council Records\Reports\1996-1998\Finance Committee (FC)
RES 145 Draft 01 1996-1998
(Related)
Path:
\Council Records\Resolutions\1996-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hawaii Electric Light Company, Inc. • PO Box 1027 • Hilo. HI 96721-1027 <br /> <br /> I May 21, 1996 <br /> .y <br /> Mr. Howard Suzuki <br /> CH Department of Public Works <br /> Division of Sewers <br /> 25 Aupuni Street <br /> Hilo, HI 96720 <br /> SUBJECT: DSM Potential and energy savings <br /> Account no. 9200-3942-001, General Lyman Field <br /> Account no. 8604-2511-001, 1076 Kalanianaole Avenue <br /> Dear Mr. Suzuki: <br /> Thanks for allowing me the opportunity of running a DSM (Demand Side Management) potential <br /> at the above accounts from our last conversation. Both accounts show great potential for energy <br /> savings. <br /> A mainframe billing calculation of the 12 month average shows that if the two accounts could be <br /> placed on a Rider M, reductions in the monthly billing are possible. The proposed practice of <br /> being self-generated in the evening hours of SPM to 9PM Monday through Friday, to ensure <br /> adherence of Rider M is all that will be necessary. Find this analysis, a copy of the Rider M, and <br /> HELCO commercial rates attached. <br /> If this potential is achievable, please contact me. A Rider M contract will need to be drawn up. <br /> Demand Side Management and providing you the lowest energy costs are objectives we strongly <br /> advocate. <br /> If I can be of further assistance, I can be reached at 969-0143. <br /> Sincerely, <br /> CMG%~~ lS. /rl~tlk <br /> Dennis K. Keawe <br /> Commercial Service Representative <br /> attachments <br /> ~i,~{.~ra~< <br /> dl:k <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.