My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0449.000 1996-1998
ClerkCouncil
>
Council Records
>
Communications
>
1996-1998
>
COM 0449.000 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 1:39:28 PM
Creation date
5/10/2008 7:55:10 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
1996-1998
Communication
0449
Point
000
Author
Donna Fay Kiyosaki, Chief Engineer
Communications - Referred To
FC
Communications - File Code
SEW
Document Relationships
AGE COUNCIL 09/17/1997 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Council
AGE FC 09/02/1997 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Finance Committee (FC)
REP FC 131 09/02/1997 1996-1998
(Related To)
Path:
\Council Records\Reports\1996-1998\Finance Committee (FC)
REP FC 131 09/02/1997 1996-1998
(Related)
Path:
\Council Records\Reports\1996-1998\Finance Committee (FC)
RES 145 Draft 01 1996-1998
(Related)
Path:
\Council Records\Resolutions\1996-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Superseding Revises' Sheet. No. 60 REVT4ED SHEET NO. 60 <br /> <br /> Effective March 1_, 1991 Eff ,tive February 21, 1995 <br /> RIDER "M" <br /> Off-Peak and Curtailable Rider <br /> Availability: <br /> This Rider is available to customers billed under rate Schedule <br /> "J" or "P" whose maximum measured peak demands prior to any load <br /> modifications effected under this rider, exceed 100 and 300 <br /> kilowatts, respectively. This Rider cannot be used in conjunction <br /> with Rider T, Rider I and Schedule U. <br /> Rate: <br /> A. Basic Rates: <br /> The rate(s) for service under this rider shall be as specified <br /> under the regular Schedule "J" or "P", whichever is applicable <br /> except that the billing demand for computing demand and energy <br /> charges shall be as defined below, subject to the requirements <br /> of the Determination of Demand provision of the applicable rate <br /> schedule. <br /> The customer shall select Option A or Option B; <br /> Option A: Off-Peak Service <br /> 1) Any demand occurring during the off-peak period shall not <br /> be considered in determining the billing kw demand for each <br /> month, but shall be used in determining the excess off-peak <br /> charge. Only the maximum kw demand occurring outside of <br /> the off-peak period shall be used in establishing the <br /> billing kw demand for the calculation of the demand charge, <br /> energy charge and minimum charge as specified in the <br /> regular Schedule J or P. <br /> 2) An excess off-peak charge of $1.00 per kilowatt shall be <br /> added to the regular rate schedule charges for each <br /> kilowatt that the maximum off-peak kw demand exceeds the <br /> maximum kw demand outside of the off-peak period. <br /> 3) For calculation of the excess off-peak charge for each <br /> month, the maximum off-peak demand and maximum demand <br /> outside of off-peak period shall be the highest measured <br /> demands during the respective periods for such month. <br /> HAWAII ELECTRIC LZGHT COMPANY, ZNC. <br /> Docket No. 7764 <br /> Decision and Order Nos. 13762 and 13773 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.