My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0449.000 1996-1998
ClerkCouncil
>
Council Records
>
Communications
>
1996-1998
>
COM 0449.000 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 1:39:28 PM
Creation date
5/10/2008 7:55:10 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
1996-1998
Communication
0449
Point
000
Author
Donna Fay Kiyosaki, Chief Engineer
Communications - Referred To
FC
Communications - File Code
SEW
Document Relationships
AGE COUNCIL 09/17/1997 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Council
AGE FC 09/02/1997 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Finance Committee (FC)
REP FC 131 09/02/1997 1996-1998
(Related To)
Path:
\Council Records\Reports\1996-1998\Finance Committee (FC)
REP FC 131 09/02/1997 1996-1998
(Related)
Path:
\Council Records\Reports\1996-1998\Finance Committee (FC)
RES 145 Draft 01 1996-1998
(Related)
Path:
\Council Records\Resolutions\1996-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ' Superseding Revis~' Sheet.No. 60A REV'"'ED SHEET NO. 60A <br /> Effective March 1_, 1991 Eff..:tive February 21, 1995 <br /> Rider "M" (Continued) <br /> Option B: curtailable Service <br /> 1) If the customer chooses to curtail his demand during the <br /> priority peak hours, he shall indicate the load that he is <br /> willing to curtail during this period. This curtailed load <br /> must be load that is normally operated during the Company's <br /> curtailable hours and must be at least SO and 150 <br /> horsepower for motor loads under Schedules "J" and "P" <br /> respectively, or 50 and 150 kilowatts for other-than-motor <br /> loads. <br /> 2) For billing purposes, the curtailed demand shall be <br /> determined monthly as the difference between the maximum <br /> demands during the outside-of-priority-peak and priority- <br /> peak periods measuzed for each month. <br /> 3) The billing demand under this curtailable service option <br /> shall be the normal billing demand under Schedule "J" or <br /> "P" reduced by: <br /> a) 75e of the curtailed demand if the curtailment period <br /> is fixed throughout the year from 5 p.m. to 9 p.m., or <br /> b) 80% of the curtailed demand if the curtailment period <br /> is as specified by the Company. <br /> B. Metering Charge <br /> An additional metering charge of $10.00 per month shall be <br /> assessed to cover the additional cost of installing, operating, and <br /> maintaining a time-differentiating demand meter. <br /> Measurement of Demand: <br /> The Company shall install a time-of-use meter to measure the <br /> customer's maximum kw load during the time-of-day rating periods. <br /> HAWAII ELECTRIC LIGHT COMPANY, INC. <br /> Docket No. 7764 <br /> Decision and Order Nos. 13762 and 13773 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.