Laserfiche WebLink
<br /> ~ YV~W n_ rar~OYdiv~an~~a,a~ <br /> <br /> ~~-Lf <br /> ~ ez~n)I ~6 Orc4~nmr~ <br /> <br /> financing. In the event that the above federal, state or other governmental <br /> <br /> funding is not available or acceptable to the applicant, the connector road <br /> <br /> shall be constructed by the applicant in three phases.'Phase 1 of the <br /> <br /> connector road shall be located between the extensions of Pu'ukalani Road <br /> <br /> and Kaomoloa Street, and shall be constructed in conjunction with the <br /> <br /> development of the immediately surrounding areas, provided further, that <br /> <br /> <br /> Phase I of the connector road shall be completed no later than the issuance <br /> <br /> of building permits for the single-family dwellings, or the issuance of final <br /> <br /> plan approval for the multiple family units, as applicable, for the three <br /> <br /> hundredth (300th) residential unit/lot within the RS and/or RM zoned <br /> <br /> areas.rePhase 2 of the connector road shall be located between the <br /> <br /> Pu'ukalani Road extension and the northern intersection of the connector <br /> <br /> road with either Kamamalu Street or the Mamalahoa Highway in the <br /> <br /> vicinity of the Waimea Civic Center, and shall be constructed in <br /> <br /> conjunction with the development of the immediately surrounding areas, <br /> <br /> provided further, that Phase 2 of the connector road shall be completed no <br /> <br /> later than the issuance of the building permit for the single-family <br /> <br /> dwellings, or the issuance of final plan approval for the multiple family <br /> <br /> units, as applicable, for the four hundred fiftieth (450"') residential unit/lot <br /> <br /> within the RS and/or RM zoned areas. hase 3 of the connector road shall <br /> <br /> be located between the extension of Kaomoloa Street and the western <br /> <br /> <br /> intersection of the connector road with Mamalahoa Highway in the <br /> <br /> -45- <br />