My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 280 Draft 02 1996-1998
ClerkCouncil
>
Council Records
>
Bills
>
1996-1998
>
BIL 280 Draft 02 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2021 1:23:54 PM
Creation date
5/10/2008 7:32:58 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
1996-1998
Bill/Resolution
280
Draft
02
Introducer
J. Curtis Tyler, III, Council Member
Referred To
COUNCIL
Action 1
Council: Refer back to PWPC - 9/2/98
Action 2
PWIRC: Amends Bill 280, Dr. 2, to Dr. 3 - 11/07/02
File Code
HCC/ADV
Document Relationships
AGE COUNCIL 09/02/1998 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Council
COM 0454.019 1996-1998
(Related)
Path:
\Council Records\Communications\1996-1998
COM 0454.019 1996-1998
(Related To)
Path:
\Council Records\Communications\1996-1998
COM 0454.021 1996-1998
(Related To)
Path:
\Council Records\Communications\1996-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) The tax map key number of the location [or] and proposed location of the sign and <br /> an accurate description of the sign, including its contents; <br /> (3) A plan or design of the sign, and a photograph or drawing, showing its weight, <br /> dimensions, lighting equipment, materials, details of its attachment and hanging, <br /> and its position relative to relevant buildings, property lines, and adjacent streets; <br /> and <br /> (4) Any other information pertinent to the application as may be required by the chief <br /> engineer. <br /> Section 3-17. Corrflpliance with article. <br /> Any permit, variance, or other approval issued pursuant to this article shall comply with all <br /> <br /> applicable requirements of this article. <br /> Section 3-1 S. Action on perrrait application. <br /> (a) Upon receiving an application for a sign permit, submitted pursuant to article 1, the <br /> Building Division shall: <br /> (1) Review the permit application for completeness; <br /> (2) If the application is deficient, identify and notify the applicant of the deficiencies <br /> in writing; and <br /> (3) If the application is complete, begin to process the application. <br /> (b) Upon receiving a complete application for a sign permit, the chief engineer shall: <br /> (1) Issue the sign permit in writing, if <br /> (A) After an examination of the plans, specifications, and other data, the chief <br /> engineer finds that the sign(s) that is the subject of the application <br /> conforms in every respect with the requirements of this article and all <br /> applicable statutes and ordinances; <br /> is <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.