Laserfiche WebLink
The applicant's objective is to develop a mixed-use project while still <br />protecting the important cultural and environmental resources of the area. The <br />applicant has recognized the benefits of planning and designing a project in a <br />manner that is sensitive to the natural features and unique heritage of the land. <br />The overall design theme provides generous open space with active and passive <br />type recreational uses. This open space area will consist of approximately 49 <br />acres that will include the Alenaio Stream drainageway. The project proposal is <br />to improve the banks of the drainageway for use as a linear park with the <br />provision of bicycle and pedestrian pathways. The southeastern side of the <br />drainageway will be designated for open space and active recreational uses. <br />The Project District will be provided with all essential utilities and <br />services. For its wastewater disposal, the applicant will provide hook up to the <br />County's sewer line located along Punahele Street. Proposed on-site <br />improvements include a pump station at the base of the Ponahawai Street <br />Extension. Electrical and telephone services are available to the project area. <br />Other public services and facilities, including the provision of park areas, will be <br />made a condition of approval of this Project District. The applicant will also be <br />required to pay a "fair share" contribution towards the development, funding, <br />and/or construction of school facilities within the school service area. <br />While the proposal is to connect vehicular traffic to Wiliwili Street, the <br />Director cannot support this at this time, because most of Wiliwili Street is <br />substandard, with only 16 feet of pavement. There will be pedestrian connections <br />from the proposed project to the side streets. The primary access will be from the <br />planned Ponahawai Street Extension. Therefore, it should be pointed out that the <br />basis for supporting this request is that approval of this Project District would <br />facilitate the completion of the Ponahawai Street Extension; thus, improving the <br />negative traffic implications if the project were granted without the condition to <br />construct the roadway in its entirety. A condition of approval is included that <br />would require the Ponahawai Street Extension be constructed from Komohana <br />Street to Mohouli Street prior to issuance of any certificate of occupancy for the <br />project or prior to receipt of final subdivision approval, whichever occurs first. <br />-5- <br />