Laserfiche WebLink
<br /> with the preliminary plat as tentatively approved. The subdivider shall submit to the director <br /> eight copies of the ftnal plat, prepared in conformity with these regulations, together with four <br /> additional copies of a genera] layout map, which was originally attached to the construction <br /> drawings and specifications (where required) showing the location of lots, streets, water mains <br /> and storm drainage systems. <br /> fib) [Ir.r,e ,.,,>„r:..:ae_ ....i:,...: ie..,.. r a..o a...... ti,,.c _e .wee ,.e <br /> ~~~~a,] For Qood cause, the director may grant to the subdivider an extension of <br /> time within which [#ae] the subdivider may file the final plat. <br /> (c) The time of filing the final plat means the time at which the final plat, together with <br /> all required data, is received by the director. The director shall indicate the date of filing on all <br /> copies of the final plat and accompanying data. <br /> Section 23-73. Technical review. <br /> Within [€rve] thirty days after receipt of the final plat and other data, the director shall <br /> submit copies of the final plat and other data to the director of public works, manager, [sanitary <br /> <br /> eagirzeer] State deyartment of health and district engineer when the subdivision involves state <br /> highways for review of the final plat with the director. The final plat shall be examined as to <br /> whether it is substantially similar to the approved preliminary plat and whether it is technically <br /> correct. The information on the final plat shall also be verified by entering upon the respective <br /> subdivision where deemed necessary by the director. If there is a variance, the subdivider shall <br /> be advised by the director of the changes or additions that must be made and given an <br /> opportunity to make corrections. The director's submission of copies of the final plat to other <br /> reviewers constitutes acceptance of the contents of the final plat, provided that the director may <br /> request supplementary information, and the director's issuance of final subdivision approval <br /> shall be valid despite the absence of technical information as required by section 23-69(1) and <br /> (3), or the absence of similar technical but non-substantive information required by sections 23- <br /> 69 and 70. <br /> Section 23-74. Final approval of plat. <br /> (a) When all the construction work is complete and is accepted in writing by the director <br /> of public works, the subdivider may apply for approval of the subdivision map for recordation. If <br /> the director disapproves the plat, the grounds for disapproval shall be filed in the records of the <br /> 12 <br /> <br />